Alternate Manufacturing Receiving


This is a maintenance utility that can be added to an Additional Options menu if required as it is not on a standard menu and the screen has not been properly GUI formatted.

When a production shift is completed, enter the manufacturing details from the Product Run Sheet, as prompted.
The requirement records that were generated when the Trial Build was accepted, are then cleared and the product file quantities are updated.

Multiple shifts can be entered to complete and close a run. A run is only closed when the Outstanding Balance on the run is zero.
A warning is displayed if materials are short, or in excess of the run requirements.

The prompts are:

PRODUCT#
Enter the manufactured product number, or press <F4> to search for it in the inventory lookup window.

PRODUCTION RUN#
Enter the run number, or press <F4> to view open runs and select one in the window.

SEQ# / SHIFT#
Enter the appropriate shift number.

DATE RECEIVED
Enter the date of the end of this shift.
This is also the date that any completed quantities are received into inventory.

LOCATION
Enter the location to which the new manufactured product should be received.

QTY. RECEIVED
Enter the quantity completed in this shift, that should be received into inventory.

BALANCE O/S ON RUN
The remaining quantity to be built for this run displays.
This can be over-typed as required.

COMPONENT WINDOW
This window display a list of the components used to build this product and the costs each.
Enter the quantity used of each of these parts. The Extended cost displays on the screen.
Press <F3> to accept these quantities and costs.

TOTAL MATERIAL COST
The material cost total from the Component window displays.
This can be over-typed as required.

# HOURS SETUP THIS SHIFT
Enter the hours used on setup for this shift.
e.g. Enter an hour and a half as 1.5

# HOURS RUN TIME THIS SHIFT
Enter the regular run hours for this shift.

TOTAL HOURS THIS SHIFT
The sum of the setup and run hours displays.

EMPLOYEE LABOUR WINDOW
Time for multiple employees may be entered in this window.
Enter the employee # and the name will display.
Enter the date and the hours for each employee.

TOTAL DIRECT LABOUR
The labour cost displays.
This is calculated using the hours from the Employee Labour window, times the employees' regular rates as setup in Time Charge Operators.

VARIABLE O.H. THIS SHIFT
The Variable Overhead for this shift displays based on the rate per hour setup in Manufacturing Parameters.
This can be over-typed as required.

FIXED O.H. THIS SHIFT
The Fixed Overhead for this shift displays based on the rate per hour setup in Manufacturing Parameters.
This can be over-typed as required.

NOTES
Enter any relevant notes for this product shift.

OPERATOR
Enter the operator code.

ENTER Y TO ACCEPT, / TO CANCEL
Enter Y (YES) to accept the run information, or / to cancel.

This receiving information can later be reviewed in Manufacturing Receiving Inquiry.