Alternate Manufacturing Receiving
This is a maintenance utility that can be added to an Additional Options menu if required as it is not
on a standard menu and the screen has not been properly GUI
formatted.
When a production shift is completed, enter the manufacturing
details from the Product Run Sheet, as prompted.
The requirement records that were generated when the Trial Build was accepted, are then cleared and the
product file quantities are updated.
Multiple shifts can be entered to complete and close a run. A
run is only closed when the Outstanding Balance on the run is
zero.
A warning is displayed if materials are short, or in excess of the
run requirements.
The prompts are:
-
- PRODUCT#
- Enter the manufactured product number, or press <F4> to
search for it in the inventory lookup window.
PRODUCTION RUN#
- Enter the run number, or press <F4> to view open runs and
select one in the window.
SEQ# / SHIFT#
- Enter the appropriate shift number.
DATE RECEIVED
- Enter the date of the end of this shift.
This is also the date that any completed quantities are received
into inventory.
LOCATION
- Enter the location to which the new manufactured product should
be received.
QTY. RECEIVED
- Enter the quantity completed in this shift, that should be
received into inventory.
BALANCE O/S ON RUN
- The remaining quantity to be built for this run displays.
This can be over-typed as required.
COMPONENT WINDOW
- This window display a list of the components used to build this
product and the costs each.
Enter the quantity used of each of these parts. The Extended cost
displays on the screen.
Press <F3> to accept these quantities and costs.
TOTAL MATERIAL COST
- The material cost total from the Component window displays.
This can be over-typed as required.
# HOURS SETUP THIS SHIFT
- Enter the hours used on setup for this shift.
e.g. Enter an hour and a half as 1.5
# HOURS RUN TIME THIS SHIFT
- Enter the regular run hours for this shift.
TOTAL HOURS THIS SHIFT
- The sum of the setup and run hours displays.
EMPLOYEE LABOUR WINDOW
- Time for multiple employees may be entered in this window.
Enter the employee # and the name will display.
Enter the date and the hours for each employee.
TOTAL DIRECT LABOUR
- The labour cost displays.
This is calculated using the hours from the Employee Labour window,
times the employees' regular rates as setup in Time Charge Operators.
VARIABLE O.H. THIS SHIFT
- The Variable Overhead for this shift displays based on the rate
per hour setup in Manufacturing
Parameters.
This can be over-typed as required.
FIXED O.H. THIS SHIFT
- The Fixed Overhead for this shift displays based on the rate
per hour setup in Manufacturing
Parameters.
This can be over-typed as required.
NOTES
- Enter any relevant notes for this product shift.
OPERATOR
- Enter the operator code.
ENTER Y TO ACCEPT, / TO CANCEL
- Enter Y (YES) to accept the run information, or / to
cancel.
This receiving information can later be reviewed in Manufacturing Receiving Inquiry.
Topic Keyword: INMR01